King George Hospital, Ilford

An internal refurbishment, our project at King George Hospital began with a soft strip-out of the existing rooms. The refurbishment included creating a new layout of the building using internal partitions. The new rooms were plastered, decorated, and fitted-out completely with new electrical and mechanical systems.

The design reflects the hospitals stringent hygiene requirements; therefore all details such as shadow gaps were eliminated.

CLICK ON THE GALLERY THUMBNAILS BELOW TO VIEW EACH IMAGE IN MORE DETAIL
DOWNLOAD THE CASE STUDY

King George Hospital, Ilford


< Back to Case Studies

Case Studies