King Edward VI Grammar School

The Learning Development Centre extension increased learning space for the school. A uniquely designed link-bridge was built to connect the original Centre to the new extension. The new building is home to spacious food technology classrooms, offices and learning support rooms. An Under-Floor Heating System was installed to heat all areas of the new building.

CLICK ON THE GALLERY THUMBNAILS BELOW TO VIEW EACH IMAGE IN MORE DETAIL
DOWNLOAD THE CASE STUDY

King Edward VI Grammar School


< Back to Case Studies

Case Studies