New Hall School, Chelmsford
The project involved the construction of a new atrium within a Grade 1 Listed building. We installed a new conservatory with a structural steel frame and remodelled the existing external fire escape staircase.
We replaced the existing internal stairway with a new powder coated architectural staircase.
Form of procurement: Spec and Drawings.
CLICK ON THE GALLERY THUMBNAILS BELOW TO VIEW EACH IMAGE IN MORE DETAIL
DOWNLOAD THE CASE STUDY
New Hall School, Chelmsford
< Back to Case Studies