New Hall School, Chelmsford

The project involved the construction of a new atrium within a Grade 1 Listed building. We installed a new conservatory with a structural steel frame and remodelled the existing external fire escape staircase.

We replaced the existing internal stairway with a new powder coated architectural staircase.

Form of procurement: Spec and Drawings.