King George Hospital, Ilford
An internal refurbishment, our project at King George Hospital began with a soft strip-out of the existing rooms. The refurbishment included creating a new layout of the building using internal partitions. The new rooms were plastered, decorated, and fitted-out completely with new electrical and mechanical systems.
The design reflects the hospitals stringent hygiene requirements; therefore all details such as shadow gaps were eliminated.
CLICK ON THE GALLERY THUMBNAILS BELOW TO VIEW EACH IMAGE IN MORE DETAIL
DOWNLOAD THE CASE STUDY
King George Hospital, Ilford
< Back to Case Studies